STREETS AND TRAFFIC ISSUES AND INFORMATION - Continued
ARCHIVES:
Possible Beltline Crossing at Watts Rd/Forward
Drive Communications
GTNA Board Member Allen Youngwood continues to be in communication with State DOT managers. Summaries of all GTNA communications with state and city transportation officials are below.
-
August 2008
Documents from the DOT about Scheduled Beltline improvements:
2008 Beltline Improvement descriptions
2008 Beltline Improvement map
-
February 2008
Communication from DOT Project Manager Larry Barta on 2/15/2008:
" The study of grade separation additions to the West Beltline
was moved into
the WisDOT's Beltline Study that extends from the 14 interchange
in
Middleton to the CTH N interchange east of Madison last fall. Phases
1 and 2
of that Beltline study are nearing completion. They catalogued existing
conditions and produced interchange improvement recommendations.
Phase 3 will start up by summer and will resume the look at new
Beltline
crossings, including several in the vicinity of your neighborhood.
We will
have general and neighborhood public meetings as part of that effort.
The
study goal will be to decide which crossings should be built in
the future,
and in what priority order. Only those that pull sufficient traffic
and are
supported by the City are expected to land on the list. Work with
neighborhoods is a key aspect because that is where changes to traffic
patterns and increases in traffic volumes will result. Our plans
would
include ways to address and mitigate any anticiapted negative affects
that
could result. Strong advocacy or opposition to any particular crossing
will
probably also figure into the results, as will construction costs
and
related impacts. At this time, we have not done enough study to
create such
a list, or even to say whether or not even 1 new crossing will result.
We are making progress on refining Verona Road improvement details.
Monthly
meetings with representatives of abutting neighborhoods, businesses,
planning and engineering staff from Madison and Fitchburg, agencies
and
other interested stakeholders are ongoing. This is a continuation
of the
meetings held earlier in the study that culminated with the the DEIS
and all
the details it contains regarding 2 alternatives. A supplemental (revised)
version of that DEIS is to be produced once all discussion and desired
changes to those 2 alternatives have been completed. More general
and
neighborhood public meetings will be held too as the work progresses.
I do
not yet have a solid time line for when public meetings should be
expected
or when the Supplemental DEIS will be ready, but the construction
start goal
is still somewhere between 2013 and 2015."
Mr. Barta has been invited to present at the March 3 Neighborhood
Forum.
-
July 2007 Update
-
May - June 2007 - Updates
-
March 2007 - Update from the Dept. of Transportation (DOT):
The West Beltline portion of the EIS (Environmental Impace Statement)
has not changed in the last 9 months. Funding is still the issue for
when this section of the beltline would be expanded to six lanes.
Budgets are getting tighter. The DOT is looking at taking an approach
to a bigger picture for the whole Madison Beltline from US 14 to the
interstate. This is in part from some of the comments from the City
of Madison and also other critical operational and safety problems
that the Beltline is experiencing.
The DOT is looking at some interim safety improvements to the Verona
Rd. interchange to help alleviate as much congestion as possible until
an ultimate solution can be implemented.
The FEIS (Final Environmental Impact Statment) has not been completed
yet and Mr. Steiner is not sure when that time will be. He thought
that the 2011 timeline has probably been moved back to around 2013
and again that is if everything falls into place.
-
June 2005 - Update from the Dept. of Transportation (DOT):
Paraphrased from e-mail conversations with John Steiner, Project Manager
for the Verona Rd. project:
- There has not been any
decision made on the Watts Road crossing or any of the other crossings.
Most of the attention has been placed on the Verona Road portion of
the study at this time. Funding is still the biggest issue for the
whole project. Even if everyone agreed that one of the beltline crossings
alternatives was viable, there would still be issues to work out with
the funding, and balancing the projects. The crossings would also
need to have local government participation for funding.
- The earliest the project
can happen is 2011 and that is only if everything falls into place.
Everyone would have to agree, funding would have to be found, and
the design and right-of-way acquisition would have to be done in order
to meet a 2011 construction year. Realistically it would probably
happen after 2011.
- The majority of the comments
sent in with the Draft Environmental Impact Statement (DEIS) had the
same theme of concerns that the residents fear possible increased
traffic through the neighborhood.
- The DEIS is not updated
unless the DOT goes to Final Environmental Impact Statement (FEIS).
Once it is determined what the final decision will be, then the document
will be finished. Everyone's concerns will be placed in the document
but not every written word from them. Comments are categorized. An
example is that maybe out of 100 letters, 35 would have the same comment.
If there are more than one comment per letter, all the comments are
taken from the letter and placed into a category. Sometimes there
may only be one comment per category but that is even placed in the
document. The DOT would keep all the original comments on file. The
new information or impacts would be included in the FEIS after the
decisions are made. There will be a need for other public information
meetings in the future for updates. Mr. Steiner does not know when
that will be at this time (as of 6/13/2005).
-
September 2004 - Click on the link below for a .pdf version of the letter
sent as formal public comment from the Board of the Greentree Neighborhood
Association to the DOT re the DEIS
Link to Common Council Resolution (.pdf
version)
-
September 2004 - Over 90 Greentree neighbors attended the informational
meeting on 9/22/04 at Falk Elementary.
John Steiner, DOT District 1, and Tom Lynch from Strand & Associates
(engineering consulting firm on the project) gave a slide presentation
just for Greentree, answered questions, and listened to neighbor comments
and concerns. There was no City traffic/planning dept. representative
at the meeting, although they were invited. The correct person at
the City to write to with concerns about this project is: David Trowbridge,
City of Madison Dept. of Planning & Development, Room LL-100,
Madison Municipal Building, Madison WI 53703.
-
September 2004 - Informational Meeting with DOT for the Greentree Neighborhood:
Wednesday, September 22, 6:30 p.m.
Falk Elementary School Gym
6323 Woodington Way
Download and/or view (.pdf): Invite
letter from DOT
-
September 2004 - Letter from GTNA board to City Common Council members (delivered
for deliberation at 9/7/04 common council meeting).
Download or view (.pdf): 9/1/04
Letter to City Common Council
-
August 2004 - DEIS Public Comment Deadline Extended to September 30, 2004
Public Comments were accepted prior to September 30, 2004, to be
included/addressed in the project’s Draft Environmental Impact Statement
(DEIS). The DEIS is the DOT’s formal process of collecting and
acknowledging public comment on proposed DOT projects.
The DOT Contact is:
Mr. John Steiner, Project Manager
District #1 Office
Wisconsin Department of Transportation
2101 Wright Street
Madison, WI 53704
-
An informational flyer WITH MAPS that was distributed to Greentree
Neighbors prior to the 9/30/04 public comment deadline can be viewed
at:
Beltline
Crossing Alt X4 Concerns (.pdf format)
|
|
|
|
|